S3 RAILMARK
Take the rail and set down on the mark. The clock is the other crew.
Design
Set down on the mark ahead of the other crew. Missing the mark fails the leg.
Take the rail and set down on the mark. The clock is the other crew.
Set down on the mark ahead of the other crew. Missing the mark fails the leg.